Things are moving along here with the construction of my new studio, and I think I can see there will be light at the end of the tunnel! The ceiling has been insulated, wired for lighting, and sheetrocked:

Studio-ceiling-wired-sheetrocked

Electric lines have been run to the far wall, and there will be outlets between every window:

Studio-Outlets-Wired

Wall insulation is underway too:

Studio-Wall-Insulation-underway

One Response to “Update on New Studio Construction”

Love the studio! Looks like there is room for me. lol It is a rainy day in Venice, so I have been on the computer a bit, checking on what I have missed. I have uploaded to my blog a few times, but can only upload vertical paintings. lol Ciao!

Something to say?